新2手机管理端(www.hg108.vip):KPower gets four-year PPA extension
时间:2个月前 阅读:19 评论:2
In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.新2手机管理端(www.hg108.vip)实时更新发布最新最快的新2代理线路、新2会员线路、新2备用登录网址、新2手机管理端、新2手机版登录网址、新2皇冠登录网址。
PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.
In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.
,,以太坊博彩游戏(www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,以太坊博彩游戏数据开源、公平、无任何作弊可能性。
KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.
转载说明:本文转载自Sunbet。
网友评论
皇冠最新线路(www.hg108.vip)
回复图个开心
彩客网(www.99cx.vip)
回复守护你~